Monday, March 11, 2013

Living the good life

I know it's been almost a month since my last post, so to bring you up to speed, we've officially moved in. However, that continues to be a work in progress, as was to be expected. As a large family trying to make the leap to a smaller place, we knew we wanted to take our time, so we could figure out what we really need and what we can live without. This process will continue over time as we carefully and honestly evaluate every article of clothing and every kitchen utensil.

So far, the kids love their new home, especially their bedroom. The wood feels so natural and peaceful. Looking out the windows in the early morning light to see our homestead is hard to explain. Heating and cooking with the wood cook stove is such a joy, but we're keeping our eyes open for a good LP gas range to use for cooking during the warmer months.

One thing I learned about our cabin is that you can't leave the floor uninsulated in the winter. I wrongly assumed that I could simply increase the heat of the cook stove and deal with cold floors until summer when it would be much nicer to crawl under the cabin. What I learned is that any spot where a piece of clothing or box or piece of furniture sat, the moisture would condense because of the cold floors and we'd have a wet spot. Not wanting to ruin the new floors, I decided I'd have to insulate. I considered using spray foam, but the cost was going to be 3 times the cost of fiberglass for about the same r-value. Plus, if I ever put in a basement, it would be much easier to pull out fiberglass than the foam. It was a horrible process of crawling around in the mud, but I got the floor insulated with r-25 fiberglass and then put 3/8" plywood under that. The cost was around $700 and well worth it.

I'll try to post more pics in the coming weeks, but here's a picture I took this morning after a fresh snowfall.

Sunday, February 17, 2013

"Are you moved in yet?"

For the past 3 months, this is the typical first question I get every time I see someone at church, at the grocery store, or just around town.  Whether easy small talk or genuine interest, this is exactly what happens.  It's not unlike the 8 month pregnant woman who has endured 7 months of "how are you feeling" or "you're almost there."  At some point you just want to be able to say--"yes, we're moved in".  We are now VERY close, and have moved some of our furniture in to the new place, but alas we are not officially "living" there yet until I get the final inspection.

Even on a relatively modest project such as this, without running water or a central ventilation system, there are innumerable codes and rules that must be followed (a/k/a hoops to jump through).  Overall this has not been a big hurdle, but now as I prepare for the final inspection, I'm trying to make sure I have everything ready to go.  Deck railings have to be finished and there are very rigid rules on spacing between railing spindles, etc.  The interior stairs are now basically done, with the exception of a few more coats of sealer and probably a hand rail at some point.  There are also a few odds and ends trim pieces to put up.

The one exterior deck is now complete and, once I complete the spindles for the other side, I should be ready to have the inspector come out to give us the okay to move in, which basically means spending the night.  In our state, most of the dwelling regulations are driven by a space where a person sleeps.  If you spend only non-sleeping time in the space, you're generally exempt.  At times this has made me want to build a tipi for "sleeping" and a really awesome "garage" to "spend our days".  Instead, we've built a very modest house, and once time and money allows, I plan to construct a sizable "shop" in which to house my tools, our garden equipment, storage, place for canning and butchering, and a rec space to house a ping pong table and other things to entertain crowds, or just our family.  By doing it this way, the square footage normally dedicated to these things in a traditional house (and taxed accordingly) is now considered agricultural space, and therefore much better on the tax bill and, as indicated above, subject to more relaxed code requirements.

In the coming weeks, once I'm no longer spending every non-job minute working on the house, I hope to offer some reflections on this process and why we are doing what we are doing, to hopefully answer the almost as innumerable questions of "how are you going to fit that many kids in such a small house" or "how are you going to live without running water?"  I'll also try to put together a detailed cost list, so you can see what this project cost us.
Kids' bedroom

Dining Room

Living Room


Heavy Timber stairs with railings


Completed Deck

Saturday, February 2, 2013

Finishing touches

The project is finally nearing the end--well, end inasmuch as we'll be able to move in soon.  It's not soon to end to the extent that we won't have running water at first, as I didn't have the money to install the septic and plumbing before winter.  There will still be much to do over the coming year but, wonderfully, it will be done by walking out my own back door.

For a variety of reasons, I decided to hire the builders to come back and do the trim.  Once again, this was a regret-free decision, as these guys do exceptional work.  I also purchased pine from them for trim, at a price a little cheaper than Menards, and made from the same species of wood as the logs.  Because the logs were out in the elements and in the sun for much of the year, they are more yellow/orange than they were when new, so the trim is a little lighter than the logs, but with time, they'll look the same.

After considering the various options about what type of sealer to use inside the cabin (and whether to use sealer), we went with a water-based Minwax Polychrylic.  It goes on very well and we've simply sealed all the wood with two coats.  I haven't stained anything--just sealed it.  Having the sealer will keep the wood (trim and logs) safer from stains and little dirty hands, will minimize the degree to which the logs turn orange with age, and should help keep them more stable.  Logs, like wood floors, change size over the course of the year, depending on the humidity.  In the summer, the air is generally more humid, so wood expands.  In the winter, as the air dries out, it shrinks a bit, which is why you may see joints in your hardwood floors in the winter that are absent in the summer.  It's also why doors on old houses may swing freely part of the year, and stick the other part of the year.

The logs have been sealed and most of the trim is up.  I'm waiting for the trim to get finished next week so I can sand the upstairs floors lightly and seal with the final coat.  Then it will be time to start moving furniture upstairs.  In particular, I need to get our queen sized box spring upstairs before the railing goes up; otherwise, it likely won't fit.

In one week we should be done with all the trim and the ceiling sealed with poly.  By next weekend, we should be enjoying the fire from the comfort of our own furniture.

Trim detail and car siding around chimney

Pine doors and trim

Sealing and drying trim

Sunday, January 20, 2013

Paint and Flooring

This past week or two has seen a lot of progress on the finish work inside the cabin.  Once the drywall joints had been taped and mudded, I sanded lightly and wiped the walls down to try and remove any dust.  Most walls these days are textured in some way, but I elected to go with smooth surface, for two main reasons.  First, I didn't want the extra time and cost associated with texturing.  Second, smooth walls are generally easier to patch than textured walls if you get holes in them, as you don't have to try to find a way to match whatever texture was used at the time of construction.  The drawback to smooth surface is you have to be more precise in your plastering/sanding, and you have to live with the inevitable little defects you won't see until painting is done.

We went with a very light yellow color for paint and are pretty happy with how it looks.  We wanted a color that was fairly light, but didn't want an off white or gray color.  We'll see how it holds up to traffic and wood heat.

One other project I did once the walls were plastered was to put the box around the chimney.  I have to keep at least a 2 inch clearance from the sides of my chimney (clearances are determined by manufacturer, and because we went with a triple wall chimney, the clearances were quite low), so measured and build the pieces and screwed them in to place.  Once the paint was done, I began adding car siding to the exterior.  I decided to go with car siding over sheetrock because 1. I was sick of hanging sheetrock and plastering, 2. I thought the wall could use a little more wood, and 3. I thought wood would be more durable than sheetrock with the kids.

Once the painting was done, I rented a commercial floor sander after work one day and sanded until well in to the morning, starting with 20 grit and moving up to 100 grit.  The floor for the loft (and what is the ceiling from the first floor) is spruce, as it is a more dense grain and harder than other pines.  The flooring is 1 1/2 (closer to 1 1/4" after milling) tongue and groove and is not designed to ever be entirely smooth like most hardwood floors.  My purpose in sanding was to get down all the dirt and dust that had been accumulated during construction, and to try to soften down some of the joints so you don't stub your toes on it.  Because I heat with wood, my floors will shrink and move quite a bit in the winter as compared to the summer, when the humidity rises again.  It's important to understand the strengths and limitations of your material.

I also had to decide what to do with floors for the main level, which was simply OSB decking.  The original hope was to put down hardwood flooring, such as hickory, but decided not to for a few reasons.  First, though I can get the flooring for $2.00 to $2.50 /sq. ft. from the local Amish, there are still quite a few additional costs to get the sander (probably a $150-200 investment for the size of my floors), the sealer (another $150-200), and the time associated with getting the floor acclimated, sanded, and sealed.  Once I knew I wasn't going to put in the hardwoods right away, I had to decide whether to try and paint the floors for now, or put down something like laminate.  I went with laminate for 3 main reasons.  First, I quickly realized that the subfloor was not going to work for painting, as it pieces would flake too much from having gotten rained on in the construction phase.  Second, I was concerned the appraiser would raise a fuss when it came time for the final bank appraisal to convert from a building loan to the a traditional mortgage.  Third, I found the laminate I liked for about $1.00/ft. square, and it goes down quickly and looks very nice when it's done.

This week we'll start putting up the trim and finishing the floors.  I'm hoping to get all the inside work done so I can get the final inspection and then, once we start to move in, I can finish some of the outside work, such as deck spindles and insulation underneath the cabin.

Electric Panel

Rented floor sander


Finished floors

Framing around chimney

Card siding started around chimney
Lower Level before flooring
Laminate flooring on first floor

East side deck and ramp

West side deck and ramp


Sunday, January 6, 2013

Plaster and Paint

We're working on the two least favorite phases of construction--plastering and painting.  I decided to hire someone to plaster the seams, but I still had to do all the sanding.  Now that that is done, we have started the painting--which I hate even worse.  Fortunately, my mom and sister came to get started on that, so maybe I'll be able to avoid that task somehow.  

The wiring is now done and one of the remaining things that must be done from a safety standpoint so as to get the final inspection is to finish the decks and railings.  Yesterday I purchased the deck boards for the two decks and cut the posts down for the railings.  I went with heavier that usual floors (2x10s spaced 16" apart and 6x6 posts), but I did it with the expectation that there's a good chance I'll eventually frame them in and add living space, so it pays to think ahead.  I also decided to go with ramps rather than steps for two big reasons.  One, I think ramps are much safer for kids, especially toddlers just learning to walk.  Second, it will make it much easier hauling firewood and water in to the cabin, especially until we get the septic and indoor plumbing installed someday.

The jury is still out on the wisdom of putting sheetrock inside the cabin.  I used sheetrock for the ceilings upstairs and the interior walls for two main reasons.  First, I thought it would be cheaper than wood.  Second, I thought it would make the inside much brighter than if there was more wood (such as car siding) on all the surfaces.  I'm not sure, in the long run, after you install the sheetrock, hire someone to plaster, do the sanding, and apply the paint, that it's really much of a savings in the long run.  If I were to do this again, I would look more closely at some low grade pine boards and then paint them white.  

One of the issues with drywall that I was concerned about and am already experiencing is cracks.  No matter how solid your foundation is, and no matter how well your cabin is constructed, logs are just going to move as they dry out and change with the humidity throughout the year.  I'm quite certain that if I ever move the cabin on a truck someday, some of the joints will crack.  I have one joint already that continues to crack, no matter how much we continue to plaster it, so I'm just going to have to leave it and hope it doesn't get worse.

This week I hope to finish painting, start installing the trim, and begin sanding and sealing the loft floor.  then it will be time to paint the floor on the first level, seal the logs, and do the last minute odds and ends like a couple doors before it's time to move in.  Here are some recents pics.












Sunday, December 30, 2012

End is in sight

I have a few minutes to spare, spam going to post a quick update. For the past month I've been very busy. On average, I spend 10 hours per day at the office, come home to have supper and spend some time with the family, and then go to the cabin for 3-4 hours to work, and then home again at 2:00 am to get to bed and start it all over again. I'd say we're about 2-3 weeks from completion.

Tonight I finished the wiring. Today is the last day I can legally do my own electrical in Wisconsin. Starting tomorrow, I have to hire a master electrician for everything. Barring any issues from the inspector, the electrical is done, other than putting on covers and installing permanent light fixtures after the painting is done.

Speaking of painting, tomorrow we will be done with the plastering and will be ready to sand and paint. I decided to hire my contractor back because I hate plastering and I'm not good at it.

Once the painting is done, trim will go up, which s being milled as we speak. Then it will be finishing the floors, finishing the decks, and cleaning up.

I'll try to post pics soon.

Sunday, December 9, 2012

Winter has set in

It's been almost a month since I last posted and much longer since I posted any pictures, so I figured anyone still out there that even bothers to check my blog is entitled to a bit of an update.

It's early December and our most recent move-in-by-Christmas goal is looking more and more unachievable, but I haven't given up yet, even if my wife has. :)  Today we got our first snowfall, and while I could have used another week or so without the white stuff, I shouldn't complain.  I was pushing my luck to the end just to get the final dirt work done, which was setting the decks and digging in the electric.  The electric line was dug a week ago and the cable went in this week, and we were shoveling the ditch back in the night before things really cooled down and froze.  It was close, but we got it done.

The electric is 95% done.  All the wires have been run and inspected, so all that remains is to hook up the service panel and install the switches, outlets, and fixtures.  We were able to do most of the electric ourselves--and satisfy the inspector, amazingly enough--but I hired an electrician to install the underground cable and he will help set up the service panel for me, just to make sure it's done correctly.  Here in Wisconsin you can still do your own electric, provided it's up to code, but starting the first of the year, the law will require us to use master electricians for all electric, as is currently the case with plumbers.

Buried cables have to be at least 18 inches per code, but I always prefer to go deeper, particularly where next year I'll have the driveway put in, which will entail cutting 12" of sod core out and refilling with gravel.  Because we had to run about 140 feet and the ground is hard and we have a fair amount of rocks, I elected to use a Bobcat and trencher to do this work.  Needless to say, even with the rock, the Bobcat made short work of this and I didn't need close to the 4 hours of time I had it rented.  I used a friend's Bobcat and paid $100 to rent the trencher for 4 hours.

I have the two exterior doors on the cabin on both gabled ends, and so it was time to get busy with the stairs or landings before the ground froze and to make it easier and safer to get in and out of the cabin.  After looking at it more closely, and considering the fact that I had a stack of used 2 x 10 lumber from a prior deck, I decided to just put an 8 foot deck on both ends of the cabin (16 feet each) and I'm glad I did.  Doing so wasn't easy, however, as the footings for the 6 posts have to be down to the code frost zone for our area (4 feet in our area).  In other words, any attachments to the home have to have the same frost protections.  So, I set out digging 6 holes to 4 feet and it took a number of days (and nights), and a pry bar and water, to get them dug.  We hit lots of rocks along the way and the clay is very hard, and there were times I wondered if we were ever going to get to 4 feet.  Finally we got it done, had the holes inspected, and then dropped concrete pads before installing the 6x6 treated posts.

Normally I would use only 4x4 for decks, and lighter boards for deck, but because I might eventually convert them to covered porches and/or make finished space out of the areas, I decided to plan ahead to make the framing adequate to support finished living space.

Inside the cabin, the loft floor was installed months ago.  Because I don't have any interior ductwork, I was able to go with tongue and groove pine floor for the loft (which is also the ceiling for the lower level).  The 1 1/4 inch spruce spans the beams and provides a beautiful floor and ceiling, although it squeaks more than I expected.  If you need to install ductwork for heating and/or AC, it becomes more tricky to hide things, meaning a separate ceiling needs to be installed to fill the cavity created by the loft floor joists.

Upstairs, after we had finished the wiring, we insulated the 2 x 12 rafters.  First, we added foam vents from the soffit to the ridge.  This cost approximately $100 and insures that the roof is well-ventilated and the insulation never impedes the airflow from the bottom of the roof to the ridge.  Next we installed 10" R-30 fiberglass insulation in between the rafters.  This was fairly straightforward, although with all the angles and the collar tie braces, you have to take your time to cut it so it all fits nice.  We put 5" R-19 in the gabled ends and dormer, which were framed.  Once the insulation was inspected, we put on 4-mil vapor barrier on and started sheetrocking.

Typically you put 5/8" sheetrock on ceilings and 1/2" on walls.  Because our loft ceiling is at a 45 degree angle, it's sort of a wall and a ceiling, and I debated on whether to just use 1/2", as the sheets are quite a bit lighter and easier to work with, and our rafters are only 16" apart, rather than the typical 24" for trusses.  Ultimately I went with the 5/8" because I thought it would better protection from having holes punched in it during use.  We are currently 95% done with the ceiling and have started the walls in the loft.  Once that is done, we'll do the few interior walls in the main floor and then begin taping and plastering--not my favorite task, but something that needs to be done.

We recently got the wood cook stove going.  The unit we bought needed new firebrick, and I soon realized they are not standard sized firebrick.  I could order them online for $90 plus $30 shipping, or could get them from the local Amish for $50.  The only down side to the Amish is he didn't have any in stock, so had to wait until they came on the yearly truck that re-supplied his store.  Finally, weeks later, the truck came in and I had the firebrick.  Once I figured out how to install them, we fired up the stove and it works beautifully.  It's much nicer working inside the cabin when there's heat, and it will also mean I can now begin plastering and painting whenever we're ready.

Here's a number of pics showing our progress.
Bottom of spruce loft floor, and ceiling for first floor

Pine floor in large loft bedroom

Oldest son enjoying the new loft floor and window

Framing for loft interior walls--one to divide two rooms and others for stairwell

Wiring view for outlet in framed gable above log knee wall

Wire for outlets in log knee wall goes through rafters and drops down into outlet cavity

Cavity between 2 x 12 roof rafters

Foam vent panels run from soffit to ridge vent before insulation is installed

Fiberglass insulation in loft ceiling and walls

Used Bakers Choice wood cook stove after chimney installed

West deck--posts will be cut to length after railing laid out

While we had the Bobcat, we decided to clear the old farm trail through the woods to provide access to fields across valley, previously accessible only by highway.

Bocat with trencher attachment

They hydraulic trencher made short work, even with rocks.  We average 30 inches deep with little problem.

We trenched approximately 140 feet in about 1 hour

First fire in cookstove after installing new firebrick

Ceiling sheetrock.  Care has to be taken to cut around collar tie cross-beams

Close up of collar ties

Wood cook stove after installation of heat shield (to reduce clearance to wall) and insulated hearth mat